MCDAME RIVER CROSSING
Services
- Project Management
Customer
Hawthorne Gold Corp
Project Date
2009
Location
Northern BCLandmark was retained by Hawthorne Gold Corp. to design and build a new bridge to replace an existing structure at their mine site in Jade City, B.C. This project involved the survey, design, supply, and installation of the 25 meter, BCL 625 bridge. The abutments and wing walls were constricted using steel faced geosynthetic reinforced soil (GRS), at a considerable savings over conventional concrete construction. This concept allowed the abutment to be built entirely out of local materials. This was a significant costs savings due to the remoteness of this site and the cost of bringing in materials.
Landmark’s project highlights include:
- 8 day construction – start to completion
- 3 month turnaround from concept to completion
- Use of local abutment material
Project Details:
- Construction Duration: 8 Days
- Channel Width (m): 15
- Design Discharge (Q100, m3/sec): 35
- Bridge Length (m): 25
- Bridge width (m): 4.5
- Clearance Height (m): 3
- Footings Material: In situ sands and gravels
- Wing Walls Material: Sands and gravels
- Abutment Material: Sands and gravels
- Design Vehicle Loading: BCL 625
- Finished Road Width (m): 8
Another successful project done in collaboration with Terratech Consulting Ltd.