HUGH KEENLEYSIDE DAM – BANK STABILIZATION
Services
- Engineering & Construction
Customer
BC Hydro
Project Date
2015
Location
KootenaysSCES was contracted by BC Hydro to complete reinforcement works to the right bank abutment below the Hugh Keenleyside Dam. Slope preparation and specific placement of a combination of design materials occurred over a 3 week period.