HINTON BRIDGE ON GRS ABUTMENTS

Services

  • Engineering & Construction

Customer

West Fraser - Hinton FP

Project Date

2015

Location

Hinton-Edson

Landmark was contracted by Hinton Wood Products to replace a culvert at crossing 185 with a steel girder bridge on Geosynthetic Reinforced Soil (GRS) abutments. The process involved damming the existing flow using steel sheet pile and diverting the streamflow during construction of the abutments. A winch truck and excavator were used to launch the bridge.

Another successful project done in collaboration with Terratech Consulting Ltd.