GRS MINI-ARCH – RED CHRIS ACCESS ROAD

Services

  • Engineering & Construction

Customer

Imperial Metals

Project Date

2008

Location

Northern BC
  • Construction Duration: 3 days
  • Channel Width (m): 1.5
  • Design Discharge (Q100 m3/s): 2
  • Culvert Length (m): 30
  • Culvert Span (m): 2
  • Clearance Height (m): 1.2
  • Footings Material: GRS supported sands and gravels
  • Wing Walls Material: n/a
  • Abutment Material: n/a
  • Design Vehicle Loading: L150
  • Finished Road Width (m): 10

Another successful project done in collaboration with Terratech Consulting Ltd.