ENGLISHMAN BRIDGE
Services
- Engineering & Construction
Customer
BC Hydro
Project Date
2013
Location
Southern BCThis project, in the Three Valley Gap area, included the installation of a temporary crossing to provide equipment access to the both sides of the stream. A 20 meter composite deck bridge was installed on post and pad footings. The bridge provides industrial access on the Victor Main Forest Service Road.