ENGLISHMAN BRIDGE

Services

  • Engineering & Construction

Customer

BC Hydro

Project Date

2013

Location

Southern BC

This project, in the Three Valley Gap area, included the installation of a temporary crossing to provide equipment access to the both sides of the stream.  A 20 meter composite deck bridge was installed on post and pad footings. The bridge provides industrial access on the Victor Main Forest Service Road.