PINE CREEK ARCH

Services

  • Engineering & Construction

Customer

Apache Canada

Project Date

2014

Location

Hinton-Edson

Landmark was contracted to replace a fish barrier (round bottom culverts) with an open bottom Geosynthetic Reinforced Soil (GRS) supported arch in the Hinton Area.  The project involved damming the flow with a temporary sheet pile wall and diverting the streamflow during construction of the streambed and arch.

Another successful project done in collaboration with Terratech Consulting Ltd.

Project Photos