CHETWYND BRIDGE

Services

  • Engineering & Construction

Customer

District of Chetwynd

Project Date

2017

Location

Northern BC

This project involved the removal of failing culverts and replacement with a concrete panel bridge supported by rock columns and GRS foundation integrated with a steel sheet pile wall.  The project, in a residential area, was constrained by overhead hydro lines and poles adjacent to the site.  The bridge was constructed during spring, 2017 when water levels were at their peak.

Another successful project done in collaboration with Terratech Consulting Ltd.

Project Photos